Sunday, 9 September 2012

Windows in and Roof almost up

Went by the house again this afternoon.

All the windows are in, except for the back bedroom and most of the roof has gone up. There was one piece that was incorrect so they have sent that back to get fixed up.

I noticed all our stacker doors on site too, so I guess they will also be going in soon.

I think they have a couple of more days left finishing the frame and then I think they are going to tile the roof first, before the brick. At least the framework will be better protected.

I have never seen the roof being tiled before the brick but when I googled, it appears to be a common thing.

Anyway, took some extra photos:

House from the street

 Side view of the front verandah

 
End of Garage with windows and Rumpus window at the back on the right


Front Entry with side lights installed 
 
Garage doors and Front entry
 
Side view of front
 

Our master bedroom windows sliding door to be installed (ensuite windows far left)

 
back of the house
 
 
Outdoor Lanai

Back of the house

Saturday, 1 September 2012

Frames Up!!



Well, managed to get some photos today of the frame and had a walk through the house.

Amazing.. It's so funny when we stood on the slab last week trying to work out how the rooms were going to fit, it just looked so small.

Now after walking through and seeing the actual rooms, it's amazing how it all just fits together.

Went by on Friday too and Brett (carpenter) and his boys were working onsite. What a nice guy.

He said they have a few days to complete and the windows are ordered for Tuesday. All the roof is onsite and crane has been ordered plus all our guttering also is onsite. It's getting so exciting now.

One thing we didn't realise is how huge the windows all are. You dont see the height on the plans only the width, but they practically go from floor to ceiling so will be interesting to see what they look like next week.

Anyway, here are some photo's, even though its hard to see what anything actually is, its too exciting not to post them up..


Master ensuite from the bedroom

 
Store room between Garage (Right), Laundry on the left

standing at our master bed door. WIR in front and ensuite to the left. no doors will be open

Standing at kitchen/family meals entry looking at Rumpus open set and alfresco on the left. Centre island in the middle and applainces etc on the rear wall (on the right of this photo)

 
Looking at Rumpus from Alfresco. Window is huge

Looking from the garden to our master at the back of the house. Sliding door in the centre and large awning windows either side



Entry looking in to the house. Double entry doors plus a secong set of white glass doors will be at the end before entering the hallway. Sunken lounge ahead

Back of the house from the garden

View from the back of the Garden

 
End of the triple garage entry to house on the left

 
Standng at the entry to kitchen/family/meals.
 
Looking the other way - Kitchen will be ahead across the back wall with large island bench in the middle. Walk in pantry on the far left, then fridge space

Garage


 
Hallway looking up from the garage entry door in to the house. kitchen/family meals ahead. When you get to the end turn left
once you turn left from the above then this is looking up the main hallway cutting through the centre of the house. Entry foyer enters on the left, sunken lounge on the right and bedroom straight ahead at the end
 
Looking up bedroom hallway on the other side of the house. Beds and main bath on the left, sunken lounge on the right and our master straight ahead
 

Laundry, really happy with the size, built in laundry cupoard will be great on the right. Laundry bench will be on the left.

 Master bedroom looking out to the garden.